1. 1. The Project is described in the project document entitled “Project Document, Phase 5 of FaDWSP,” 2005–2009, which shall serve as the basis of the schedule of operations.
    • - – This document provides an indication of:
      • - – the contribution of either party;
      • - – the number and duties of the staff appointed by each party;
      • - – their job descriptions;
      • - – the duration of their assignments;
      • - – an indicative time-table and
      • - – a description of the equipment and materials to be made available.
  2. 2. The document mentioned in paragraph 1, which may be amended in common agreement by the Executive Authorities, shall form an integral part of this Administrative Arrangement.